A site-based plan for Durban port logistics, including container receipt, inland movement, and delivery to the press floor.

How Durban Port affects a working press week
The Durban Port page maps the logistics from container receipt through inland movement to delivery at the press floor. It is useful when a CI, narrow-web or stack press shipment needs to clear the port route cleanly before installation starts.
For a Durban Port movement, start with container dimensions, gross mass, and the press section list. CI frames, narrow-web units, dryers, anilox crates, and stack press modules each place different demands on lifting gear, road permits, and receiving access. Salt air at the harbour, depot dwell time, and the inland route to Gauteng or the Cape also affect how the shipment should be packed and checked.
Take the arrival photo set before any wrapping is cut away at the depot or plant. Images of container seals, skid condition, rust spotting, shock labels, and crate numbers give the installation team a useful record when parts are unloaded at the press position. That file should sit with the delivery papers and the machine packing list, not only on a phone.
Durban arrival file contents
The Durban Port record should end with a clear movement plan from quay release to the machine bay. Include the press type, crate count, lifting points, site access limits, and any damage seen on arrival. A short written route for one shipment is worth more than general notes that do not match the load.
Before the truck leaves Durban Port, match every crate mark to the press schedule and the receiving plant record. Check whether the site can take the delivery vehicle length, axle load, and offloading sequence for each section of the line. Use the contact form with container details, dispatch paperwork, and the sizes of access doors and ramps.
- Container list matched to press sections
- Arrival damage logged before unpacking starts
- Delivery photos filed with the job record
Durban harbour handling factors
Port release timing, stack dates, and transporter booking can shift an installation sequence before the press reaches site. Durban traffic on N2 and N3 legs, depot operating hours, and escort requirements for oversized loads should be checked against the plant handover plan. If the machine is going inland, note where weather, roadworks, or storage transfers could expose crates to extra handling.
Coastal conditions matter when electrical cabinets, chilled rollers, and spare parts sit near the harbour. Moisture, salt residue, and rough forklift handling can mark panels, wiring glands, and guarding before commissioning starts. On receipt, inspect wraps, desiccant packs, pallet bases, and impact indicators while the delivery vehicle is still on site.
Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.
Port-to-press briefing points
Send the Durban Port job details with floor photos, loading access, delivery timing, and the faults already found on the press or line.
Send the Durban Port job details with container numbers, consignee papers, offloading equipment on hand, and the route from gate to machine position. Add photographs of door widths, turning space, slab condition, and any press faults found during strip-down or inspection. Keep this note with the project file so transport, rigging, and installation teams work from the same shipment record.